Journal cover Journal topic
Hydrology and Earth System Sciences An interactive open-access journal of the European Geosciences Union
Journal topic

Journal metrics

Journal metrics

  • IF value: 4.936 IF 4.936
  • IF 5-year value: 5.615 IF 5-year
    5.615
  • CiteScore value: 4.94 CiteScore
    4.94
  • SNIP value: 1.612 SNIP 1.612
  • IPP value: 4.70 IPP 4.70
  • SJR value: 2.134 SJR 2.134
  • Scimago H <br class='hide-on-tablet hide-on-mobile'>index value: 107 Scimago H
    index 107
  • h5-index value: 63 h5-index 63
Volume 17, issue 2
Hydrol. Earth Syst. Sci., 17, 795–804, 2013
https://doi.org/10.5194/hess-17-795-2013
© Author(s) 2013. This work is distributed under
the Creative Commons Attribution 3.0 License.
Hydrol. Earth Syst. Sci., 17, 795–804, 2013
https://doi.org/10.5194/hess-17-795-2013
© Author(s) 2013. This work is distributed under
the Creative Commons Attribution 3.0 License.

Research article 22 Feb 2013

Research article | 22 Feb 2013

A Bayesian joint probability post-processor for reducing errors and quantifying uncertainty in monthly streamflow predictions

P. Pokhrel, D. E. Robertson, and Q. J. Wang P. Pokhrel et al.
  • CSIRO Land and Water, Graham Road, Highett, Victoria, Australia

Abstract. Hydrologic model predictions are often biased and subject to heteroscedastic errors originating from various sources including data, model structure and parameter calibration. Statistical post-processors are applied to reduce such errors and quantify uncertainty in the predictions. In this study, we investigate the use of a statistical post-processor based on the Bayesian joint probability (BJP) modelling approach to reduce errors and quantify uncertainty in streamflow predictions generated from a monthly water balance model. The BJP post-processor reduces errors through elimination of systematic bias and through transient errors updating. It uses a parametric transformation to normalize data and stabilize variance and allows for parameter uncertainty in the post-processor. We apply the BJP post-processor to 18 catchments located in eastern Australia and demonstrate its effectiveness in reducing prediction errors and quantifying prediction uncertainty.

Publications Copernicus
Download
Citation